EasyManua.ls Logo

Martin SQC2 - Maintenance Procedures; Maintenance Safety Information; Weekly Maintenance Tasks

Martin SQC2
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Martin Engineering GmbH 33 M3682UK-09/17
Installation
2. Remove all tools and fire protection covers from the installation
site and the conveyor belt.
3. Perform a 1-hour test run of the conveyor system.
4. Shut off the conveyor system after the 1-hour test run, shut off
the power supply and secure it against inadvertent reactivation.
5. Check whether all of the fastening parts are securely tightened.
Tighten any loose connections.
6. Inspect the belt cleaner for the following conditions:
Wear: minor break-in wear is normal. This stops as soon as
the blades have adjusted to the shape of the conveyor belt.
Bulk material accumulation: No bulk materials must
accumulate between the blades and return side.
7. Follow the corresponding instructions in Section 7
“Troubleshooting”for cases of excess wear, bulk material
accumulation, or other problems.
WARNING RISK OF INJURY!
Body parts and/or clothing may get caught and pulled in by
rotating parts or by the moving conveyor belt.
Shut off the power supply to the conveyor system and its
accessories and secure it against unauthorised reactivation before
performing any installation or maintenance work.
Use warning signs!
CAUTION RISK OF DAMAGE!
Never operate the fully tensed belt cleaner for longer than
15 minutes on the running unloaded conveyor belt. A risk of
damage due to overheating exists for the belt cleaner and/or the
conveyor belt.
Only operate the fully tensed belt cleaner on the running and fully
loaded conveyor belt.

Table of Contents