EasyManua.ls Logo

Martin SQC2 - Tensioner Removal Procedure

Martin SQC2
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Martin Engineering GmbH 10 M3682UK-09/17
Preparing for the installation
3. The delivery should include the following parts, depending on
the scope of the order:
•Martin
®
SQC2™ Secondary Cleaner
•Two Martin
®
SQC2™ tensioners
Two Crushing Hazard Warning Labels
Part No. 30528
Two Conveyor Products Warning Labels:
Part no. 23395
Two label for tension values:
Part No. SQC2-10002G
Installation instructions.
4. Report any missing or damaged parts to Martin Engineering or
one of its authorised dealers.
4.1.3 Removal of the tensioner
The Martin
®
QC™ #2 tensioners must first be removed to prepare
for the installation. The following steps must be taken for both spring
tensioners.
1. Pull the wire lock pin (7, Fig.1) out of the upper bearing bush
(5, Fig.1).
Fig. 1:
7
5

Table of Contents