EasyManua.ls Logo

Mec 65-J - Platform Control Operation and Function Tests

Mec 65-J
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 24 65-J Diesel - Operator’s Manual
September 2022Section 7 - Operating Instructions & Pre-Operation Function Tests
Platform Control Operation & Pre-Operation Functions Test
Entering The Platform
Personnel shall enter and exit the platform only at the Personnel Entry Gates, and only when the
boom is fully retracted and lowered.
Ensure that all Personnel Entry Gates are properly closed and that the Swing Gate is latched in the
closed position before operating the machine.
ART_4727
Swing
Gate
Personnel Entry Gates
Lift Gate
Lift Gate
Fall Protection
ART_4713
Personal fall protection equipment (PFPE) is required when operating this
machine.
All PFPE must comply with employer and job site rules and applicable
governmental regulations, and must be inspected and used in accordance with
the PFPE manufacturer’s instructions.
ALWAYS wear approved fall protection, properly attached to a designated
anchor point, when operating the machine.
DO NOT attach more than one lanyard per anchor point.

Related product manuals