Page 33 65-J Diesel - Operator’s Manual
September 2022Section 7 - Operating Instructions & Pre-Operation Function Tests
Auxiliary Power System & Test
If primary power fails while the platform is elevated, use the Auxiliary
Power System to safely lower the platform.
Do not climb down the boom assembly or exit the platform while
elevated.
ALWAYS check over, under and around the machine for personnel,
structures and obstructions before activating any control function and
continue to watch for hazards while operating the machine.
Base Controls
Upper Auxiliary
Power Switch
Lower Auxiliary
Power Switch
Auxiliary
Power Switch
The Auxiliary Power System is used to lower the platform in case of primary power failure. To lower