17.3 Maintenance plan
Maintenance work should only be conducted by authorised MEIKO personnel.
Maintenance procedures
-M
/
– FV
Check pumps for watertightness, pump rotor noise, rotation di-
rection and function
Check pump sieves correctly fitting and operating correctly
Check sliding ring washer/contra-rotation ring
Check water level in tank
Check that wash water pipe is watertight
Check washing system is complete and produces correct spray
pattern
Check flow pressure/water pressure
Check rinsing system is complete and produces correct spray
pattern
Check that system is watertight
4. Housing and mounting parts
Check housing, tank, sheet metal cover, hood, doors and cover-
ing of machine base for damage and correct operation
Check boiler, hoses, clamps, plastic parts and seals
Check operation of raising and lowering equipment
5. Fresh water installation
Check valves, clean dirt trap
Check that all connections (incl. hand spray) are watertight
Check settings of built-in water softener (if fitted)
Check operation of complete or partial water softener (if fitted)
For the GiO module: Perform pre-filter change
(must be completed every 6 months at the latest)
Check pressure hose position and operation of drain pump
7. Electrical installation
Tighten all electrical connections
Check tank and boiler heating
Check thermostat and stop switch
8. Electrical safety check (certificate is optional)
once a