■■■■■■■■■■■■■■■■■■■■■■
4 Installation
930 Compact IC Flex ChS/PP/Deg (2.930.1360)
■■■■■■■■
37
3
Starting equilibration
■ Start the equilibration in MagIC Net: Workplace ▶ Run ▶ Equili-
bration ▶ Start HW.
■ Visually inspect whether all capillaries and their connections from
the high-pressure pump to the detector are leak-tight. If eluent is
leaking out anywhere, tighten the corresponding pressure screw
further, or loosen the pressure screw, check the end of the capil-
lary and shorten it using the capillary cutter if necessary and
retighten the pressure screw.
4
Conditioning the system
Continue rinsing the system with eluent until the desired stability
level for the baseline has been attained .
The instrument is now ready for measuring samples.