EasyManua.ls Logo

Mindray Zonare ZS3

Mindray Zonare ZS3
295 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ZS3 Service Manual Page 247 of 295
Figure 19.37-ZS3
3. When installing the trackball, lead the grounding cables through the bottom gap
of the metal plate, align the socket interface with the side opening of the metal
plate, push down the trackball until it clasps into the square holes of the metal
plate, and use screws to fix the grounding cable to the metal plate.
Figure 19.38-ZS3
4. Reinstall the User Interface assembly in reverse order of the removal steps
listed above and proceed to System Verification.
Two hooks
Two hooks
Screw for
fixing the
grounding
cables
Align
Lead the grounding cable through the
bottom gap of the metal plate

Table of Contents

Related product manuals