EasyManua.ls Logo

Mitsubishi Electric QD77MS - Machine OPR Operation Timing and Process Time

Mitsubishi Electric QD77MS
1052 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 - 64
Chapter 6 Sequence Program Used for Positioning Control
Machine OPR operation timing and process time
[QD77MS4 operation example]
BUSY signal
Standby OPR Standby
Positioning operation
t1
t4
t2
t3
Md. 26 Axis operation status
OPR request flag
( Md. 31 Status: b3)
Positioning start
signal
[Y10, Y11, Y12, Y13]
[XC, XD, XE, XF]
Start complete signal
[X10, X11, X12, X13]
OPR complete flag
( Md. 31 Status: b4)
(Note): Refer to Section 3.3 for input/output signal of QD77MS16.
Fig. 6.9 Machine OPR operation timing and process time
Normal timing time Unit: [ms]
Operation cycle t1 t2 t3 t4
QD77MS2
0.88 0.2 to 0.3 1.8 to 2.7 0 to 0.9 0 to 0.9
1.77 0.2 to 0.3 2.7 to 3.9 0 to 1.8 0 to 0.9
QD77MS4
0.88 0.2 to 0.3 1.8 to 2.7 0 to 0.9 0 to 0.9
1.77 0.2 to 0.3 2.7 to 3.9 0 to 1.8 0 to 0.9
QD77MS16
0.88 0.3 to 1.4 1.8 to 2.7 0 to 0.9 0 to 0.9
1.77 0.3 to 1.4 3.2 to 3.9 0 to 1.8 0 to 1.8
The t1 timing time could be delayed depending on the operating conditions of the
other axis.

Table of Contents

Related product manuals