EasyManua.ls Logo

Mitsubishi Electric QD77MS - JOG Operation Timing and Processing Time

Mitsubishi Electric QD77MS
1052 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 - 6
Chapter 11 Manual Control
JOG operation timing and processing time
The following drawing shows details of the JOG operation timing and processing
time.
[QD77MS4 operation example]
Reverse run JOG start signal
[Y9, YB, YD, YF]
BUSY signal [XC, XD, XE, XF]
Forward run JOG start signal
[Y8, YA, YC, YE]
Standby (0)
Positioning operation
Positioning complete signal
[X14, X15, X16, X17]
Md. 26 Axis operation status
OFF
OFF
OFF
OFF
t2
JOG operation
(3)
t1
t3
t4
ON
ON
Standby (0)
(Note): Refer to Section 3.3 for input/output signal of QD77MS16.
Fig. 11.5 JOG operation timing and processing times
Normal timing times Unit: [ms]
Operation cycle t1 t2 t3 t4
QD77MS2
0.88 0.4 to 0.9 0 to 0.9 1.8 to 2.7 0 to 0.9
1.77 0.4 to 1.4 0 to 1.8 3.2 to 3.9 0 to 1.8
QD77MS4
0.88 0.4 to 0.9 0 to 0.9 1.8 to 2.7 0 to 0.9
1.77 0.4 to 1.4 0 to 1.8 3.2 to 3.9 0 to 1.8
QD77MS16
0.88 0.4 to 0.9 0 to 0.9 1.8 to 2.7 0 to 0.9
1.77 0.8 to 1.4 0 to 1.8 3.2 to 3.9 0 to 1.8
Delays may occur in the t1 timing time due to the operation status of other axes.

Table of Contents

Related product manuals