EasyManua.ls Logo

Moeller WINbloc eco PROFIBUS-DP Series - Page 119

Moeller WINbloc eco PROFIBUS-DP Series
151 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Diagnostic Possibilities with S7
and PB DP
115
05/01 AWB2700-1384GB
9
80C0 The specified connection is
already allocated by another
task.
80C1 Resource bottleneck at the CPU
on which the SFC is running, e.g.
* the maximum number of
different send requests is
already being processed.
* the connection resource is, for
example, allocated for receipt.
80C2 Temporary low resource level of
the communcation partner, e.g.:
* the communication partner is
currently processing the
maximum of tasks.
* the required equipment
(memory etc.) is allocated.
* insufficient working memory
(initiate a compression action).
80C3 Error during making of
connection, e.g.:
* the S7 station is not connected
to the MPI subnet. The station
has been addressed to the MPI
subnet.
* the communication partner is
not longer accessible.
* temporary low resource level of
the communication partner
Error code Explanations (general) Explanations (SFC-specific)

Table of Contents

Related product manuals