EasyManua.ls Logo

Moeller WINbloc eco PROFIBUS-DP Series - Page 27

Moeller WINbloc eco PROFIBUS-DP Series
151 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
General Information
23
05/01 AWB2700-1384GB
3
Tension Clamp Distribution Rails
Each distribution rail element consists of the insulation body and
the connecting element for the supply connection. The cross
connection is already built into the connecting element. On one side
there is a socket contact, on the other a pin. This ensures that the
cross connection for supply distribution is connected automatically
when the connection elements are joined together. The individual
elements are locked together securely by the additional locking
clips.
Figure 4: Joining of distribution rail elements
Distribution rail elements can be separated as easy as they can be
put together. Just pull the elements apart manually or separate
with the help of a screwdriver.
Figure 5: Separation of distribution rail elements

Table of Contents

Related product manuals