Operation 5-25
SG 2000 Installation and Operation Manual
Figure 5-27 provides greater detail of the DS-SG2-DRT-2X/A second RF input cable connection to
the LIDB. This cable connects the other half of the split return to the DS-SG2-DRT-2X/A.
Figure 5-27
DS-SG2-DRT-2X/A second RF input cable connection
Second RF
input cable
Transmitter to node
service cable
SG2-PS Power Supply
The DS-SG2-DRT-2X/A requires the SG2-PS power supply rather than the SG2-PS2 power supply.
The SG2-PS provides the power required to support dual DS-SG2-DRT-2X/A transmitters in a
redundant configuration.
Figure 5-28 illustrates the SG2-PS power supply:
Figure 5-28
SG2-PS power supply
SG2-PS