EasyManua.ls Logo

MSR ELECTRONIC PolyGard 2 MC2 - 3 Installation; Mounting Instructions

Default Icon
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual PolyGard
®
2 Sensors 2023-11 Page 10 | 40
3 Installation
Check the order for completeness and correctness using the delivery papers and unit la-
bels.
Caution:
Electronics can be destroyed by electrostatic discharge (ESD).
Therefore, the installation work should be done only by persons connected to ground
(according to DIN EN 100015).
3.1 Mounting Instructions
See user manual of the SB2, MSC2, MSB2 or WSB2 Boards.
When choosing the mounting site please pay attention to the following:
It is mandatory to comply with the legal requirements for the installation of gas detectors.
The optimum mounting location may vary depending on the area of application.
The recommended mounting height depends on the relative gas density of the type of gas to
be monitored.
Depending on the relative gas density (d), the following recommendation applies:
d ≤ 0.85: Mount 0.30.5 m below the ceiling
0.85 < d < 1.15: Mount at a height of 1.21.8 m above floor
d 1.15: Mount at a height of 0.30.5 m above floor

Table of Contents