5 Commissioning
5.1 General
Only trained technicians should perform the following when commissioning:
Check for correct mounting location.
Check for correct connection.
Install the Sensors if not already installed ex works.
Check connector for correct engagement (SC2).
Check power voltage (MC2).
Calibrate (if necessary).
Within the first weeks after commissioning, there may be a deviation in the sensor behaviour.
5.2 Required Instruments for commissioning (calibration)
Service-Tool STL06 or
Software PCE06 incl. PCE06-Tool
For MC2 in addition to tool or software: Adapter STA06_MC2
Alternative for MC2: STL06-MC2-A1 Tool
Calibration:
o Zero calibration: Test gas bottle with synthetic air (21 % O
2,
79 % N
2
) or clean ambient
air
o Zero calibration for carbon dioxide / oxygen: Test gas cylinder with pure nitrogen 5.0
o Gain calibration: Test gas bottle with target gas concentration in the range 3090 % of
the measuring range. The rest is synthetic air.
o Gain calibration for semiconductor sensors: The concentration of the test gas must be
50 % of the measuring range. The rest is synthetic air.
o Extraction set consisting of gas pressure regulator and flow controller
o Calibration adapter with tube: Type C2-Z4 (type CAL01-PX2 for stainless steel housing)
o Calibration adapter with tube for IR sensors (not for Premium IR): Type C2-Z6