EasyManua.ls Logo

MSR ELECTRONIC PolyGard 2 MC2 - Glossary

Default Icon
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual PolyGard
®
2 Sensors 2023-11 Page 39 | 40
Glossary
Gas application time
Time period during which test gas must be supplied to the sensor.
Run-in time
Time the sensor needs to be continuously supplied with the operating voltage for stabilisation be-
fore calibration.
Response time t
90
Time span from the occurrence of a gas mixture at the gas inlet to the moment when the display
shows 90 %.
Test gas
Gas mixture of known composition used for testing and calibrating the sensor
Warm-up Time (stabilisation time)
Time span from switching on the device in a specific atmosphere to the moment when the measured
value reaches the specified deviations and is stable.

Table of Contents