EasyManuals Logo

MTD P90 Series User Manual

MTD P90 Series
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #60 background imageLoading...
Page #60 background image
P90 Series Vertical Shaft Engines
54
6. Inspect the oil drain-back port. Make sure it will
allow oil to drain back into the engine.
See Figure 5.10.
7. Reassemble the PCV valve.
8. Tighten the cover bolts to a torque of 53 - 71 in lbs
(6 - 8Nm).
9. Inspect the PCV tubing for cracks, brittleness or
signs of leaking. Replace the PCV tube if any are
found.
See Figure 5.11.
10. Re-assemble the engine by following the above
steps in reverse order.
11. Test run the engine before returning to service.
Figure 5.10
Oil drain port
Figure 5.11
PCV tubing
PCV
chamber
cover
www.mymowerparts.com
For Discount Cub Cadet Parts Call 606-678-9623 or 606-561-4983
www.mymowerparts.com
For Discount Cub Cadet Parts Call 606-678-9623 or 606-561-4983

Table of Contents

Other manuals for MTD P90 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MTD P90 Series and is the answer not in the manual?

MTD P90 Series Specifications

General IconGeneral
BrandMTD
ModelP90 Series
CategoryEngine
LanguageEnglish

Related product manuals