MI.NET MULTI-NETWORK COLLECTOR
27
Installation and Operation Manual
Figure A1-7: Enclosure attached to the loose bands Figure A1-8: C00169 tool attached to top band
1. Tighten both bands, making sure the outer wrap stays over the inner wrap. Use the black marker to put markings on the
banding material (i.e. |||||| like marks every ~ .25") where it is to be drawn through the buckle. This allows you to see
the band tightening.
2. Tighten the double band until it has almost stopped tightening (as shown by the |||||| markings).
3. Use the ROBO-GRIP to bend the buckle ears together a little. This assures that the hammer can be utilized to properly
fold the ears down over the band after the C00169 tool is removed.
4. Loosen the C00169 tool as described in the C00169 Operating Instructions, step 5. The vise grips may be utilized to
keep the double band from slipping as/when the banding tool is removed.
5. Holding the banding tight, use the hammer to bend the holding ears down. Then, fold the banding material back over
the top of the buckle & hammer it down. Leave 1" of banding material folded back over the buckle & remove the rest.