EasyManua.ls Logo

multivac P300 - Page 76

multivac P300
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
Check the chamber for leaks
76 11.06.2014
¾ Set the evacuation time to 30 s with the <arrow keys>.
¾ To start the machine after it has been switched on, firmly press
the opened chamber lid shut against the resistance by pressing
the middle of its front edge.
¾ Pull the mains plug shortly before the evacuation time has
elapsed.
¾ Observe the pressure display on the control terminal.
If the pressure climbs in one minute by less than a graduation
mark on the black scale (0.02 bar): the chamber is not leaking.
If the pressure climbs in one minute by more than a graduation
mark on the black scale (0.02 bar): the chamber is leaking.
¾ If the chamber is leaking, perform the following operations:
¾ If the chamber lid gasket is wavy, smooth the chamber lid gas-
ket flat.
¾ If there is a gap between the beginning and end of the chambe
r
lid gasket, remove the chamber lid gasket once more and in-
stall it again.

Table of Contents

Related product manuals