EasyManua.ls Logo

Nacra F16 - 2 Mast Assembly; Diamond Wires

Nacra F16
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NACRA EMPOWERING SAILORS SINS 1975
2. Mast assembly
2.1 Diamond wires
It is preferable to place the mast on supports
while building the mast.
1. Get the brass ng from the rigbox kit dia-
mond adjuster and the diamond wires.
2. Lead the diamond wire through the slots in
the mast. Grease the threads of the diamond
wires and t one wire into the brass ng.
3. To t the other diamond wire into the brass
ng let another person coorperate by
turning the diamond wire at the other end.
4. Grease the diamond adjuster bolt and adjust the
washers and mastbase in the order as shown on
the picture.
Place the mastbase on the mast and pull the
diamondwires further through the diamond slots
in the mast.
5. Bend the diamond wire tang away
from the mast
6. Adjust the diamondwires on the diamondwire
tang with the two clevis pins 1/4 x 1/2 from the
spreader aachment rigbox kit.
The ring must be on the outside! Tape the Ring!
Tools needed:
- long nose plier
The brassng is asymmetric. Make sure
the brassng is in the same posion as
shown in the pictures!

Related product manuals