NEAX 2000 IPS Configuration Guide
Page 28 NDA-24347, Issue 1
Installation Hardware Chapter 3 Module and Installation Hardware
1.1 G, one set of Mounting Bracket is required for each stack of four or more PIMs
and attached to the top PIM. (Optional)
An I/F Bracket is used for Floor-standing Installations to join the neighboring top PIM
in a configuration of six PIMs or more. One set of I/F Bracket is required for multiple
stacks. (Optional)
A Base Tray Assembly is used for Floor-standing Installations (UL compliant).
One Base Tray Assembly is required for each stack. (Optional)
Note: For the purpose of simplifying orders, a Base/Top ASSEM includes a Power
cable for PIM 0 and Label.
Table 3-2 Installation Hardware
ABBR. NAME CODE
PART
NUMBER
QUANTITY
Front Cover
NEAX 2000
IPS Front
Cover Kit
151346
NEAX 2000 IPS Front Cover (Blue)
Left Top Cover Triangle/Name Plate
Name Plate
Cover Parts
ASSEM-A
151347
Left Top Cover Triangle/Name Plate
Base/Top
ASSEM
SN1545
BASERE
151109 One per Stack
Hanger ASSEM
Hanger
ASSEM (UL)
151373
One per PIM
(Wall-mounting Installation)
19-inch Bracket
19-inch Rack
Bracket (A)
151369
One per PIM
(19-inch Rack-mounting Installation)
19-inch Rack
Bracket (B)
151371
One per Stack
(19 inch Rack-mounting Installation)
Mounting
Bracket
Mounting
Bracket
151372 One per Stack (Optional)
I/F Bracket
I/F Bracket
ASSEM
151374 One per System (Optional)
Base Tray
Base Tray
ASSEM
151375 One per Stack (Optional)