EasyManua.ls Logo

Necta Koro - Push-Button Board; Boiler Control Board

Necta Koro
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NW Global Vending TECHNICAL MANUAL
This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.
. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of NW GLOBAL VENDING
. All rights reserved.
New dispenser “KORO” 07/10/2005 page 23 / 42
17 - PUSH-BUTTON BOARD
18 - BOILER CONTROL BOARD
1 - Selection buttons
2 - Not used
3 - To mechanical counter (optional)
4 - To actuation/CPU board
5 - Input
6 - Display adjustment trimmer
7 - To display
8 - 12 Vdc validators
9 - Not used
10 - RS232 serial port
11 - Not used
12 - Programming access button
13 - Wash button
14 - Display card
Triac board
This board is controlled by the machine board and is
powered under 230 V AC.
It used for controlling and starting the boiler heating
element.
Connector J2 is connected to a 230V AC phase
Connector J1 receives the information from the SM
board
that sends a consent signal to activate the triac for the
power supply to the heating element.
6
4
STRC
2
3
5
7
8
9
10
11
12
13
1
14

Other manuals for Necta Koro

Related product manuals