7.
Drill a hole for the condensation hose and electrical
cable at a suitable angle and the correct diameter
for your unit (see table). Insert and adjust a plastic
pipe.
Drill diameterModel
65 mmAG-WL10-4
80 mmAG-WL10-7
8.
If necessary, open the casing after the perforation
for connecting the pipe. Work from the outside of
the unit.
9.
Drill the holes necessary to secure the unit. Check
that the supplied plugs are the correct size and
quantity.
10.
Lay the screened communication cable (B) and con-
nection cable (C) between the two units. Check that
the cables to the indoor unit protrude at least 150
mm from the wall. See image below.
11Chapter 5 | InstallationAG-WL10