19PELLUX 100/20 TOUCH
PELLUX 100/30 TOUCH
EN
Location of components - boiler
1. Exhaust fan.
2. Smoke tube cleaning mechanism.
3. Convection ducts (smoke tubes).
4. Flue gas turbulators.
5. Adjustment feet.
6. Soot box.
7. Ceramic insert.
8. Ash box.
9. Burner.
10. Circuit breaker, 10 A.
11. Cleanout cover.
12. CH heating water supply connection.
13. Boiler regulator (operator panel).
14. Main ON/OFF switch.
15. Throttle for burner supply lines.
16. Sight glass for burner ame checks.
17. Boiler door.
18. Auxiliary CH heating water supply connection.
19. Duct for cables.
20. CH heating water return connection.
21. Blowdown connection.
Description:
Chapter 8 | Technical Specications