EasyManua.ls Logo

Nice Mercury 310

Nice Mercury 310
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mercury 310 Automated Gate System
Installation and Programming Manual
1414
Below is a list of tools and materials necessary for installation of the control box:
Wire cutters/strippers
Basic hand tools (screwdrivers, wrenches, pliers, etc..)
Drill and assorted size bits
Hardware for mounting control box
Electrical conduits, wire nuts, grommets, asphalt patch, etc. as needed
3: INSTALLATION SAFETY
4: TOOLS AND MATERIALS
CAUTION
The gate operator installation is NOT a “do-it-yourself” project. Contract a qualied gate operator
installation company to install this system to ensure a safe and reliable installation.
Property owner is responsible to ensure installer is qualied to make a safe and professional
installation.
Consult local government agencies for up-to-date rules and regulations to satisfy licensing, codes
or regulations that regulate automated gate system design and installation.
The gate being modied should be level and plumb and the gate should open easily and evenly.
Nice swing gate systems are NOT intended for installation on an incline.
These instructions assume actuator(s) has been installed per the applicable actuator installation
manual. Install actuator before performing the procedures in this manual.
www.ApolloGateOpeners.com | (800) 878-7829 | Sales@ApolloGateOpeners.com

Table of Contents

Other manuals for Nice Mercury 310

Related product manuals