Mercury 310 Automated Gate System
Installation and Programming Manual
7979
The installer and customer must each ensure that all of the following actions have been completed. Left box is
for installer check o󰀨 and the right box is for customer check o󰀨.
15: INSTALLATION CHECKLIST
CI
Installation Checklist

The gate(s) has been checked to make sure it is level and moves freely in both directions.

Potential pinch areas have been guarded so as to be inaccessible OR have contact and/or non-
contact external entrapment devices installed.

If pedestrian tra󰀩c is expected, a separate pedestrian gate has been installed, a minimum of seven
feet from the gate. The customer has been informed that all pedestrian tra󰀩c must use the pedestrian
gate.

Warning signs have been installed on each side of the gate in highly visible locations. The customer
has been informed that these signs must remain at all times.

There are no controls installed within 6 feet of the gate.

The installer has properly adjusted the obstruction sensing feature and has tested the gate to make
sure that the gate stops and reverses a short distance with minimal resistance applied on a swing
gate, at the end of the gate.

The installer has instructed the customer in the proper use of the gate operator and reviewed all of
the operational functions, obstruction sensing devices, external entrapment sensors, warning buzzer
and reset, etc.

The installer has instructed the customer in the proper way of disconnecting the operator. Manual
disconnect must never be used while the gate is in motion. The power must be turned o󰀨 and battery
disconnected before disengaging the operator.

The installer has answered any questions the customer has regarding the operation of the gate
operator and gate operator safety precautions.

The installer has explained to the customer that a regular maintenance schedule for both the gate and
the gate operator is recommended.

The installer has given the keys for the control box and TITAN actuator release, if applicable.
APPENDIX
www.ApolloGateOpeners.com | (800) 878-7829 | Sales@ApolloGateOpeners.com

Table of Contents

Other manuals for Nice Mercury 310

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nice Mercury 310 and is the answer not in the manual?

Nice Mercury 310 Specifications

General IconGeneral
BrandNice
ModelMercury 310
CategoryController
LanguageEnglish

Related product manuals