4103270
Installation
A1-67
E 2000 Nordson Corporation
All rights reserved
41-3000V
Issued 5/00
A3EN-04-[3V-A-AAXP]-12
Follow these procedures to flush the system and prepare it for first
operation. This part of the Installation section also includes the
procedure for adjusting the pressure control valve on gear pump units.
WARNING: Allow only qualified personnel to operate the unit.
Use this procedure to fill the tank with unmelted adhesive. Before
continuing, refer to General Hot Melt Material Processing Instructions at
the beginning of this manual.
1. If you have not already done so, program your unit. Refer to System
Programming Procedures in this section.
2. Open the tank lid.
WARNING: Use a metal or plastic scoop to fill the tank with
adhesive. Never use your bare hands.
3. See Figure A 1-43. Use a metal or plastic scoop and fill the tank with
adhesive to within 25 mm (1 in.) of the top of the tank.
4. Close the tank lid.
5. As the system scans through the system settings, check that all
temperatures are set as recommended by your adhesive supplier.
6. Go to the next procedure, Flushing the System.
Fig. A 1 -43 Filling the Tank with
Adhesive
9
. System Preparation
F
i
l
l
i
n
g
t
he Ta
n
k
w
i
t
h
A
d
he
s
i
ve

Table of Contents

Other manuals for Nordson 3100V Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nordson 3100V Series and is the answer not in the manual?

Nordson 3100V Series Specifications

General IconGeneral
BrandNordson
Model3100V Series
CategoryMelting Machines
LanguageEnglish

Related product manuals