Part 12 - Installation Checklist
Table 32 - Installation Checklist
Wiring Yes Note
Has the power and control been wired per boiler wiring diagram, this manual?
Is the main electrical connection polarity within boiler requirements?
Does the power supply voltage agree with the boiler rating plate? 120V AC?
Start-Up, Adjust, and Test Yes Note
Has the boiler been started?
If necessary, has the boiler gas valve been adjusted?
Has the installation been customized per installation location requirements?
Have all customized system parameters been tested?
Has proper boiler operation been conrmed?
Burner Flame Yes Note
Has the burner ame been checked?
Have combustion values been veried with a calibrated combustion analyzer?
If the ame does not appear normal, it may need to be cleaned by a qualied service technician. See ame
sight glass window location.
Final Installation Approvals
Signed by Technician Date