EasyManua.ls Logo

Nvidia Spectrum-2 SN3420 - Installation; System Installation and Initialization

Nvidia Spectrum-2 SN3420
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NVIDIA Spectrum-2 SN3000 1U and 2U Switch Systems Hardware User Manual 12
Installation
System Installation and Initialization
Installation and initialization of the system require attention to the normal mechanical,
power, and thermal precautions for rack-mounted equipment.
The installation procedure for the system involves the following phases:
Ste
p
Procedure See
1 Follow the safety warnings Safety Warnings
2 Install a 100A DC disconnect switch
100A DC Disconnect Switch
Requirement
Note
The rack mounting holes conform to the EIA-310 standard for 19-inch
racks. Take precautions to guarantee proper ventilation in order to
maintain good airow at ambient temperature.
Note
Unless otherwise specied, NVIDIA products are designed to work in
an environmentally controlled data center with low levels of gaseous
and dust (particulate) contamination.
The operation environment should meet severity level G1 as per ISA
71.04 for gaseous contamination and ISO 14644-1 class 8 for
cleanliness level.

Table of Contents

Related product manuals