EasyManua.ls Logo

OMC RE20 - Optional Sub-PCB Installment; Installation Steps

OMC RE20
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
Installation
,
O
p
eration and Maintenance Manual ManRE20en Rev.06/2022
OMC S.p.A: Via G. Galilei, 18 - 20060 - Cassina de Pecchi (MI) - ITALY - www.omcvalves.com - Tel.: (+39) 02.95.28.468
7. Optional Sub-PCB Installment
By adding sub-PCB, the positioner can have an additional PTM function.
Fig. 7-1: Sub-PCB of PTM
When purchasing option a sub-PCB separately, 4 Bolts and 2 supports are supplied together with
sub-PCB.
7.1 Installation steps
1. Mount 2ea of sub-PCB support on sub-PCB with 2ea of bolt.
2. Open base cover, PCB cover. Separate the Main PCB from base body.
3. Insert connector of sub-PCB into connector of main PCB correctly.
4. Fasten sub-PCB with the rest of bolt 2ea.
Fig. 7-2: Installation of Option PCB on Main PCBs
5. After PTM sub-PCB is installed newly, values of TR_ZERO and TR_END must be calibrated for
correct output signals. For the calibration of TR_ZERO and TR_END, please refer to section 8.7.2 of
this manual.

Table of Contents