7
EtherNet/IP Connection Procedure
7.4.4. Setting the Connections
Associate the tags of the target device with the
tags of the originator device.
↓
7.4.5. Transferring the Tag Data Link
Parameters
Transfer the set tag data link parameters to PLC.
↓
7.5. EtherNet/IP Communication Status
Confirm that the EtherNet/IP tag data links operate
normally.
↓
7.5.1. Checking the Connection Status
Check the connection status of the EtherNet/IP
network.
↓
7.5.2. Checking the Sent and
Received Data
Check that the correct data are sent and received.