EasyManua.ls Logo

Paccar Peterbilt 587 - Page 156

Paccar Peterbilt 587
239 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREVENTIVE MAINTENANCE SCHEDULE PART 8: MAINTENANCE AND SERVICE
– 154 – Y53-6032 (R05/10)
Tires &
Wheels
Disc wheels Inspect the wheel disc for any cracks or surface irregularities. Inspect the
rim edge and bead seat area for damage. Replace any damaged wheels -
DO NOT ATTEMPT TO REPAIR.
X
Demountable rims Inspect the mounting ring, rim gutter, side ring, and lock ring for damage;
replace as required.
X
Wheel nuts and studs Check the tightness of the fasteners and tighten the fasteners to the speci-
fied torque as required (see page 185
).
X
Wheel nuts and studs Inspect for damaged hex corners, stripped or damaged threads, and
excessive corrosion; clean or replace as required.
X
Power
Steering
Reservoir Check the fluid level (see page 171
). X
Reservoir (ON HIGHWAY) Drain, replace the filter, and refill (see page 171
). X X
Reservoir (OFF HIGHWAY) Drain, replace the filter, and refill (see page 171
). X X
Steering gear Check the lash of the sector shaft; adjust as required. X
Steering gear Grease the trunnion bearing (EP NLGI #2 lithium-based, moly-filled, HD
grease).
X
Steering gear Grease the input shaft seal (EP NLGI #2 lithium-based, moly-filled, HD
grease).
X
Power assist cylinder Lubricate the ball joints. Inspect for leaking rod seals, damaged ball joint
boots, and damage to cylinder rod or barrel.
X
Hoses and tubes Check for leaks and chafing. X
Table 2 Preventative Maintenance Schedule (Continued)
SYSTEM COMPONENT MAINTENANCE TASK
Recommended
PM Interval
I ABCDE
Y53-6032.book Page 154 Monday, May 24, 2010 3:37 PM

Table of Contents

Related product manuals