2015OPERATIONSMANUAL
33
ORDER OF OPERATIONS
THE FOLLOWING IS THE ORDER OF OPERATIONS FOR A FLANGE
GUSSETED BAG.
1. JAW OPEN
2. FILM DRIVE
3. VERTICAL SEAL HEATERS
4. ZIPPER WHEELS
5. ULTRASONICS
6. GUSSET
7. BAG STRETCHER
8. JAW CLOSE
9. HORIZONTAL SEAL HEATERS
10. CUTTER BLADE
11. PRODUCT ARRIVAL
THE PRODUCT ARRIVAL SHOULD BE SET FOR THE PRODUCT TO
ARRIVE JUST AFTER THE JAW CLOSES AND MUST FULLY ACCUMULATE
ON THE JAW BEFORE THE JAW REOPENS.
THE PACMAC VFFS RELIES ON PROPER SETUP TO ACHIEVE
MAXIMUM PERFORMANCE. PLEASE REFER TO THE PACMAC VFFS
START UP PROCEDURE FOR MORE INFORMATION ON MACHINE START
UP.
DEFINITON OF TERMS
BPM BAGS PER MINUTE
DWELL UNIT OF TIME IN WHICH AN ASSEMBLY IS IN
OPERATION.
DISPLAY STATUS REFERENCE SCREEN WITH REAL TIME
INFORMATION FOR BAG MAKING AND
TROUBLESHOOTING. FOUND IN THE TOP RIGHT
HAND SIDE OF THE COMPUTER SCREEN.