EasyManua.ls Logo

Pacmac 2015 - MACHINE INSTALLATION PROCEDURE; MACHINE PLACEMENT GUIDELINES; VOLTAGE AND AIR REQUIREMENTS

Pacmac 2015
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2015OPERATIONSMANUAL
67
MACHINE INSTALLATION
MACHINE PLACEMENT
THE PACMAC MUST BE SET CENTERED UNDERNEITH THE FILLER (I.E.
SCALE/CONVEYOR) SO THAT THE PRODUCT DROPPING OUT
FALLS DOWN THE CENTER OF THE FORMING TUBE ASSEMBLY.
ALLOW ADEQUATE SPACE AROUND THE MACHINE SO THAT THE
DOORS CAN BE OPENED FULLY AND THE FILM AND ZIPPER CAN
BE LOADED.
VOLTAGE REQUIREMENTS
208-240 VAC 50AMP
AIR REQUIREMENT
100-120 PSI 50CFM
MINIMUM PIPE SIZE 3/4” ISD (INSIDE DIAMETER) PIPE.