EasyManua.ls Logo

Palfinger PTV 33 - Page 72

Palfinger PTV 33
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PTV 35/44/55/66 Installation Manual
Rev. 1.1 70
Open the Liftgate Platform (continued): Be certain operating area around platform is clear before opening
platform. Pushing the “DOWN” button, and OPEN” button together to power the platform open.
OPEN
DOWN
3. Lower the platform to the ground: Pushing the “DOWN” button, lower the platform to the ground.
Note: for power down operation, push the down button twice (within 3 seconds).
DOWN

Table of Contents

Related product manuals