www.pall.com/biopharm 16
8. Begin ination by switching the
‘
BAG INFLATION’ switch to ‘ON’.
G
as should now start to enter the
single-use mixer system
WARNING!
O
perator should be in
attendance throughout
steps 8 - 13
9. As the system inates the shaft
coupling will move towards the
bottom of the tote.
Align the shaft coupling, sample
line and outlet tubing with the
ports on the bottom of the tote
(see next picture).
10. As the system approaches full
ination. STOP ination by turning
the BAG INFLATION switch to the
‘OFF’ position to allow operator to
conduct steps 11 & 12.
Drive coupling port
Outlet tubing port
Outlet tubing port