10.2.1. SELECT THE BEST LOCATION / (Refer to “Select the best location”
section)
10.2.2. HOW TO FIX INSTALLATION PLATE
The mounting wall is strong and solid enough to prevent it from the vibration.
: Unit centre point should be at more than 450 mm at right and left of the wall.
/ The height should be more than 195 mm from the ceiling.
: From installation plate end to unit’s left side end is 50 mm.
: From installation plate end to unit’s right end is 50 mm.
: Connecting cable should be about 750 mm from this line. (Only for left rear
piping)
: For left side piping, piping connection for liquid should be here.
: For left side piping, piping connection for gas should be here.
1. Mount the installation plate on the wall with 6 screws. / (If
mounting the unit on the concrete wall. Consider using anchor
bolts.)
- Always mount the installation plate horizontally by aligning
the marking-off line with the thread and using a level gauge.
2. Drill the piping plate hole with ø70 mm hole-core drill.
- Line according to the arrows marked on the lower left and
right side of the installation plate. The meeting point of the
47