* 1 Power supply cables (L1, L2, L3 ) should be wound together for one circle.
Motor cables (U, V, W ) should be wound together for one circle. 1 circle (bypass 1 line)
* 2 Please wind the power supply cables (L1, L2, L3) for one circle separately.
Please wind the motor cables (U, V, W ) for one circle separately. 1 circle (bypass 1 line)
* 3 Power supply cables (L1, L2, L3) should be wound together for four circles.
Motor cables (U, V, W) should be wound together for Four circles.
If cables cannot be laid down by four circles, two separate ferrite coils should be used to circle two cables s separately.
* 4 Motor cables (U, V, W ) should be wound together and bypass two ferrite coils of parallel connection. 1 circle (bypass 1 line)