EasyManua.ls Logo

Parker EY Series - Commissioning, Use, and Maintenance; Commissioning and Handling Procedures

Parker EY Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
57Pvd3675_Gb_Ey_Septembre_2017
4. COMMISSIONING, USE AND MAINTENANCE
4.1. Instructions for commissioning, use and maintenance
4.1.1. Equipment delivery
All servomotors are strictly controlled during manufacturing, before shipping.
While receiving it, it is necessary to verify motor condition and if it has not been
damaged in transit. Remove it carefully from its packaging. Verify that the data written
on the label are the same as the ones on the acknowledgement of order, and that all
documents or needed accessories for user are present in the packaging.
Warning: In case of damaged material during the transport
, the
recipient must immediately make
reservations to the carrier through
a registered mail within 24 h.
4.1.2. Handling
The servomotors EX8 are equipped with two lifting rings intended for handling.
Caution: Use only
servomotors lifting rings, if present, or slings to
handle the motor. Do not handle the motor with the help of electrical
cables, connectors or use any other inappropriate method.
The drawings below show the correct handling procedure.
DANGER: Choose the correct slings for the motor weight. The two
slings must
the same length and a minimum angle of 50° has to be
respected between the motor axis and the slings.
(Any slinging must
be done according to current standards and regulations in each
country.)
50°mini

Table of Contents

Related product manuals