EasyManua.ls Logo

Parker K-MT 1-8 - Installation; Preconditions for installation

Parker K-MT 1-8
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
K-MT1-8_EN_082014 23
Installation
Only authorized and qualified specialist personnel may carry out work on
pipes and electrical systems.
As soon as the dryer has been set up at its installation location, you can install
the compressed air infeed and outlet lines make the electrical connections.
Preconditions for installation
For a correct installation the following preconditions must be met on the part of
the owner.
Connections and lines for the infeed and outfeed of compressed air must be
provided.
A compressed air inlet valve as well as a compressed air outlet valve must
be installed by the owner, so that the dryer can be installed and maintained in
a depressurised condition (see also the installation example on page 24).
All pipes, couplings, and connections must have the correct diameter and
match the operating pressure.
Hazard caused by exceeding the limit values!
A safety device must be provided in order to protect against the maximum
permissible operating pressure from being exceeded.
The safety device must be installed so that the dryer is reliably protected
from exceeding the maximum permitted operating pressure even when
the temperature of the compressed gas increases.
The data required to meet these preconditions are contained in the technical
documentation attached in the annex.
Warning!
If the above preconditions are not complied with, a safe operation of the
dryer cannot be assured. Also, the functionality of the dryer may be
detrimentally affected.

Table of Contents

Related product manuals