EasyManua.ls Logo

Parker K-MT 1-8 - Regular maintenance intervals; Maintenance task overview

Parker K-MT 1-8
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Regular maintenance intervals
40 K-MT1-8_EN_082014
Regular maintenance intervals
Note:
If a chamber has been depressurised, e.g. after completion of the
expansion phase, and the pressure remains above 0 bar, the chamber
is pressurised by what is known as ram pressure. This might be due
to
blockage at the muffler(s)
contamination of the perforated plates
spent drying agent
To prevent such malfunctions, regularly service the dryer as
described below.
The table provides an overview of the maintenance work to be carried out. The
individual tasks are described in the following pages.
Component
Maintenance task to be carried
Maintenance interval
daily
12 months
24 months
48 months
see page
Complete dryer
Carry out visual and function checks.
41
Muffler
K
-MT 1-2:
Clean muffler, replace if necessary.
42
K-MT 3-8:
Mufflers must be replaced annually and after each
desiccant change.
42
Fine filter muffler (option)
Replace silencer element annually and after each
desiccant change.
42
Sensor of optional dewpoint-
sensing control system
Replace
43
Solenoid valves
Replace membrane.
44
Solenoid and check valves
Solenoid valves: Replace membranes and coils.
Check valves: Replace balls and springs.
45
Demisters, perforated plates,
drying agent
Replace
45
Upstream and downstream
filter
Please see the enclosed operating instructions for the attached filters. Maintenance
work has to be carried out as specified in this document.
When carrying out any maintenance work, comply with the following safety
instructions:

Table of Contents

Related product manuals