EasyManua.ls Logo

Paul FOCUS 200 - Checklist B Maintenance Work for Qualified Personnel

Paul FOCUS 200
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53
Checklist B Maintenance work for qualified personnel
Maintenance work enter result
The listed maintenance work must be carried out in accordance with the components actually present.
Comments on status using informal protocol
Further annual tranches on separate sheet
No.
Components
Annually
Result
20...
20...
20...
20...
20...
1 Fan / ventilation unit
Cleaning of components
carried out?
- Fan
- Enthalpy exchanger
- Air-contacting
surfaces on unit
yes / no
Frost protection / dew
device operational?
yes / no
Structure-borne sound
transmission, are
fasteners avoided?
yes / no
Are status displays
operational?
yes / no
2
Electrical engineering /
control
Cable connections and
clamping assemblies
secure?
yes / no
Are the regulating and
control units functional?
yes / no
3
Ventilation tube / heat
insulation
Has cleaning (if
necessary) been carried
out? Testing OK? For
cleaning when needed,
see VDI 6022
yes / no
Heat insulation and
moisture barrier OK?
yes / no
Are flexible connections
between the unit and
ventilation tube
functional?
yes / no
4
Fan, ventilation unit, filter,
filter status
Stipulated filter class
adhered to?
yes / no
5
Fan / ventilation unit and
fireplace if available
Safety feature with
fireplace operational?
yes / no
6
Extract air / supply air
passage
Seat and locking
provided?
yes / no
Stipulated filter class
adhered to?
yes / no
Filter, filter status OK?
yes / no
Air volumes acc. to
protocol OK?
yes / no
7 Overflow air vents
Open cross section
provided?
yes / no
No structure-borne and
airborne sound
transmission?
yes / no

Table of Contents

Related product manuals