Commissioning and handover protocol
Customer data
Family name: First name: Tel.:
Street: Postcode: Town/city:
Construction project:
Unit type: Serial no.: Year of construction:
Completeness
No. Components Version Result
1 Supply air duct
- Design as planned
- Cleaning option provided
yes / no
yes / no
2 Supply air vents
- Arrangement as planned
- Design as planned
- Cleaning option provided
yes / no
yes / no
yes / no
3 Overflow air vents
- Arrangement as planned
- Design as planned
yes / no
yes / no
4 Extract air vents
- Arrangement as planned
- Design as planned
- Cleaning option provided
yes / no
yes / no
yes / no
5
Extract air duct
- Cleaning option provided
yes / no
6
Extractor fan
- Cleaning option provided
yes / no
7
Control / regulation system
- Operational
yes / no
8 Filter, optional
- Replacement or
cleaning option provided
yes / no
9 Heat exchanger for waste heat recovery - Cleaning option provided yes / no
10
Documentation
- Available
yes / no
Function
1
Operational with rated ventilation, as
planned
Result OK
Action required
yes / no
yes / no
2 Switching steps possible, as planned
Result OK
Action required
yes / no
yes / no
3 Electrical power consumption
Result OK
Action required
yes / no
yes / no
Record of confirmation
Date: ..................................Signature/stamp: ...................................................................................................
Commissioning personnel / installation technician