HAND FORM
STRAIGHT PIECE
Fig. 6--gJanges Bnstalmed on PHIZ060 Units
C00006
Fig. 7--Area Not to Be DriJJed More Than 3/4°in.
C00007
If the installation requires draining the condensate water away fi'om the unit, install a 2°in trap using a 3/4-in. OD robing or pipe. (See Fig 9 and
10.) Make sure that the outlet of the trap is at least 1 in lower than d-_eunit &ain-pan condensate connection to prevent the pan fiom overflowing.
Prime the trap with water. Connect a drain robe using a n_inimum of 3/4-in. PVC, 3/4-in. CPVC, or 3/4-in. copper pipe (all field supplied). Do
not undersize the robe. Pitch the drain robe downward at a slope of at least 1 in. t'or every 10 t't of horizontal run. Be sure to check the drain tube
_br leaks. Prime trap at the beginning of the cooling season start-up. Allowable glues for condensate trap connection are: Standard ABS, (PVC,
or PVC cement.
8