18
4
4
Dismantle intermediate props and store in pallets.
Remove Flexclip with the Fixing Tool.
For horizontal transport, the heads stay attached to the props!
Lower all crosshead props by approx. 4 cm.
Alternative to Fig. 2
Use hammer blow to lower the Lowering Head = 4 cm.
With larger spans, begin lowering and removal of props
in the slab centre.
Curing time must be taken into consideration!
Push back wedge to the original position for the next
use and hammer in securely.
Remove cross beams with Erection Bar and store in pallets.
Cross beams placed under the plywood formlining joints
remain in position.
12
2a 3
A5 Striking
MULTIFLEX Girder Slab Formwork
Assembly Instructions for Standard Configuration