EasyManua.ls Logo

Perkins 35943 - Schedules

Perkins 35943
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 35943
Page 14
Schedules
The schedules which follow must be applied at the interval (hours or months) which occur rst.
A First service at 25/50 hours D Every 1000 hours
B Every day or every 8 hours E Every 2000 hours
C Every 500 hours or 12 months F Every 3000 hours
A B C D E F Operation
●
Check the amount of coolant in the header tank
●
Check the engine for leakage of oil and coolant
●
Check the specic gravity of the coolant (2) (3)
● ●
Check the tension and the condition of the drive belt
●
Check the impeller of the raw water pump
●
Check the strainer at the raw water pump outlet
●
Check the sea water strainer
● ●
Drain water from the fuel pre-lter (1)
●
Renew the element / canister of the fuel lter
●
Check the atomisers, always renew the clamps (2)
●
Check the amount of lubricating oil in the sump
●
Check the lubricating oil pressure at the gauge
●
Renew the engine lubricating oil (4)
●
Renew the canister of the lubricating oil lter
●
Remove and clean the pipe(s) for the engine breather
●
Renew the engine breather (2)
●
Clean or renew the element of the air lter
●
Check all hoses and connections
● ●
Check the valve tip clearances of the engine, and adjust if necessary (2)
●
Check the audible warning system which protects the engine
●
Check the alternator, the starter motor etc.(2)
●
Check the glow plugs (2)
(1)If one is tted.
(2)By a person who has had the correct training.
(3)Renew the coolant every 6 years. If a coolant inhibitor is used instead of coolant, it should be renewed every 6 months.
(4)The oil change interval will change with the amount of sulphur in the fuel (see the table and the Fuel Specication in section 5). The
interval to change the canister of the lubricating oil lter is not affected.
Note: To ensure that the engine runs at maximum efciency, the operations that follow must be done every
12 months or less. If the raw water is excessively contaminated, these operations should be done more
frequently.
• Clean the tube stack of the heat exchanger for the closed circuit coolant

Table of Contents