EasyManua.ls Logo

Pfaff 1295

Pfaff 1295
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Adjustment
13 - 16
13.05.14 Thread check spring, without subclass -900/56
Requirement
The movement of thread check spring 5 must be finished when the needle pointe enters
the material (=spring stroke of about 7 mm).
Fig. 11 - 14
Adjust stop 1 (screw 2) according to Requirement.
To adjust the pressure of the spring, turn screw 3 (screw 4).
For technical reasons the length of the thread check spring stroke may vary
upwards or downwards a little.
4
5
1
3
2
7 mm

Other manuals for Pfaff 1295

Related product manuals