Installation and commissioning
8.03 Commissioning the machine
Check the machine, especially the electri-
cal leads, for any damage.
Remove pin 1 of the oil reservoir 2
(Fig
.
8 - 09
).
The pin serves only to protect
the machine from damage
during transport and must not
be used when sewing.
Clean the mac
hine thoroughly and oil it
(see chapter 10 Care and maintenance).
Have skilled personnel check if the ma-
chine can be operated with the av
ailable
mains voltage.
.
Do not operate the machine if there is any discrepancy.
Before commissioning the machine, have specialized personnel check whether
the parameter 799 (machine class) is set at "1" and the parameter 800 (sewing
direction) is set at "1". If necessary, have the adjustment carried out (see Chap-
ter 8.05 Basic position of the machine drive unit).
On machines with programmable fullness control
(sub-class -91
8/55) this check function is not necessary.
The machine ma
y only be connected to an earthed socket!
Connect the machine to the compressed air supply.
When it is connected, the gauge
should show a pressure of approx. 6 bar. If necessary, have this reading correctly set
(see Chapter 10.05, Checking/adjusting the air pressure).
8.04 Switching the machine on/off
Switch the machine on (see Chapter 7.01, On/off switch).
Fig. 8 - 09
1
2

Table of Contents

Other manuals for Pfaff 487

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pfaff 487 and is the answer not in the manual?

Pfaff 487 Specifications

General IconGeneral
BrandPfaff
Model487
CategorySewing Machine
LanguageEnglish

Related product manuals