EasyManua.ls Logo

Philips DVDR600VR/37 - Page 183

Philips DVDR600VR/37
204 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Alignments, Test Procedures
EN 32 VAD80418.
Flowchart for test instruction
In the flowchart below it is described how and when the burn in
test has to be carried out.
Figure 8-3
incoming DVDR set for repair
DVDM related
normal repair
process
short term test procedure
(see REMARK1):
LVP12.01
DVD+R
CD-RW low reflection
DVDM Fails?
long term test procedure:
DVD+RW burn in recording
1h - 2h
(M1/HQ - M2/SP)
exchange DVDM
DVDM Fails?
exchange DVDM
NFF process
No
Yes
Yes
NO
YES
No
finalize repair/
general functional test of
complete set
Remark 1:
LVP 12.01: 7104 099 91731 track 28 --> 31 : 1 min.
DVD+R: record 1 min./stop/open/close/
playback recorded track : 4 min.
CD-RW low refl.: 7104 099 96581
check readability of TOC : 1 min.
Exchanged
DVDM?
No
Yes
Remark 2:
NFF process:
- 1st step: contact the customer directly by phone or e-mail to discuss the problem of the set
- 2nd step: if contact with the customer is not possible then add a paper with the returned set,
informing the customer about the possibility to contact the technician directly.
Following information should be mentioned on the paper:
- name of the technician
- company telephone number (extension) of the technician (for direct contact)
- jobsheet number
- information that the set was tested and found to be within the specs. and no failure occured
during the quality and functional check

Table of Contents

Related product manuals