EasyManua.ls Logo

Pilz PSEN opII3H Series - Checking the Safety Light Curtain

Pilz PSEN opII3H Series
67 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PSEN opII3H Series
Operating Manual PSEN opII3H Series
1003503-EN-05
| 43
Regular checks and maintenance
Checks
Regular checks can bring to light changes to the plant/machine, safeguards and ambient
conditions.
Regular check
Pilz recommends that the safety light curtain be checked every six months.
} Check the safety light curtain’s front panel.
Scratched front panel: Replace the safety light curtain.
Dirty front panel: Clean the front panel [ 45].
In a particularly dirty environment, front panel cleanliness should be checked more
frequently.
} Check the tightness of the safety light curtain’s front panel.
All screws must be tightened to the torque specified in the Technical details [ 48].
} Check the safety function of the safety light curtain (see Check the safety function of the
safety light curtain [ 36]).
Checking of safety light curtains with beam coding
When switching on the safety light curtains, the correct function of the coding must be
checked.
INFORMATION
This inspection may only be carried out by qualified personnel.
The following LEDs must light after switching on:
Receiver
Status
Ready for operation
green green
The current reception quality status
is indicated.

Table of Contents

Other manuals for Pilz PSEN opII3H Series

Related product manuals