115
KRP-500P
5
6 7 8
5
6 7 8
A
B
C
D
E
F
50F DIGITAL Assy
3
Remove the four screws. (ABZ30P080FTC)
1
Disconnect the two flexible cables.
2
Lift the multi base section to the direction of the
arrow.
3
Multi base Section
Multi base Section
50F DIGITAL Assy
1
1
1
1
2
2
3
2
1
3
4
Note: The wiring shown in the photo is different from the actual wiring, because the product in the photo is a prototype.
Upon servicing, be sure to restore the original wiring of the unit after repair work.
Note:
When you remove whole Multibase Section, it is not
necessary to remove terminal panel SEP.
Screw tightening order